Explore

A whole-home renovation is one of the biggest upgrades you can make to your lifestyle and long-term home value. It’s also a complex project—so the difference between “exciting” and “overwhelming” usually comes down to planning, clear decisions, and schedule control.

If you’re considering a whole-home renovation in Kamloops, here’s what the process looks like from start to finish—and how to keep it running smoothly.

3 reasons whole-home renovations get delayed

  1. Demo starts before materials are secured (cabinets, tile, fixtures, doors, specialty finishes)
  2. Change orders stack up and quietly crush budget + timeline
  3. Key details get left to be decided on site, which slows production and forces rushed choices

For the full list, see our guide on common home renovation mistakes to avoid.

The whole-home renovation process (step-by-step)

1. Consultation + Goal Setting

We start with a free 30-minute video consultation to align on goals, priorities, and scope direction.

2. Scope + Budget Alignment

Before we measure or schedule, we confirm what’s included, what’s not, and what success looks like.

Budget note: Whole-home renovations often land in the several-hundred-thousand range, depending on scope, structural changes, and finish level.

3. Site Measure + Existing Conditions

We document the home, identify constraints (structure/mechanical/layout), and confirm project logistics.

4. Selections + Pre-Construction Planning

This is where whole-home renovations are won. We lock in the decisions that protect schedule and quality—finishes, fixtures, layout details, transitions, and key ordering.

5. Budget Refinement + Final Schedule

We build the schedule before construction starts and refine budget based on real selections. Progress is reviewed daily and adjusted immediately if anything changes.

6. Permits + Approvals (Kamloops)

We coordinate permitting and inspections to keep the project compliant and moving.

7. Construction + Finish + Handover

Construction moves through structural/mechanical, drywall, flooring, cabinetry/millwork, and final finishes. We complete a walkthrough with you, handle deficiencies before final, and provide a one-year warranty.

Typical timeline for a whole-home renovation

Every home is different, but most projects land around:

  • Planning + selections: up to 3 months
  • Permits: about 1 month
  • Construction: 3–4 months

Want the full deep dive? Read: How long does a renovation really take in Kamloops?

Living in the home during construction

For whole-home renovations, we generally recommend moving out. It’s faster, cleaner, and less stressful. The exception is when there’s a clearly separate portion of the home not being renovated that we can coordinate and isolate.

Is Live Timber a fit for your project?

We’re a fit for homeowners who value craftsmanship, disciplined planning, and a predictable process — not the lowest bid.

Next step

Book a free 30-minute video consultation to align on scope, budget ranges, and next steps.

Book a Free Consultation

Recent Posts

Book a free phone consultation